Elazouni, A M and Metwally, F G (2007) Expanding Finance-Based Scheduling to Devise Overall-Optimized Project Schedules. Journal of Construction Engineering and Management, 133(01), 86–90.

Goldenberg, M and Shapira, A (2007) Systematic Evaluation of Construction Equipment Alternatives: Case Study. Journal of Construction Engineering and Management, 133(01), 72–85.

Hanna, A S, Chang, C, Lackney, J A and Sullivan, K T (2007) Impact of Overmanning on Mechanical and Sheet Metal Labor Productivity. Journal of Construction Engineering and Management, 133(01), 22–28.

Jung, Y and Kang, S (2007) Knowledge-Based Standard Progress Measurement for Integrated Cost and Schedule Performance Control. Journal of Construction Engineering and Management, 133(01), 10–21.

Li, Y, Nie, X and Chen, S (2007) Fuzzy Approach to Prequalifying Construction Contractors. Journal of Construction Engineering and Management, 133(01), 40–49.

Liu, L and Zhu, K (2007) Improving Cost Estimates of Construction Projects Using Phased Cost Factors. Journal of Construction Engineering and Management, 133(01), 91–95.

Lucko, G, Vorster, M C and Anderson-Cook, C M (2007) Unknown Element of Owning Costs—Impact of Residual Value. Journal of Construction Engineering and Management, 133(01), 3–9.

Moussa, M, Ruwanpura, J and Jergeas, G (2007) CTAN for Risk Assessments Using Multilevel Stochastic Networks. Journal of Construction Engineering and Management, 133(01), 96–101.

Polat, G, Arditi, D and Mungen, U (2007) Simulation-Based Decision Support System for Economical Supply Chain Management of Rebar. Journal of Construction Engineering and Management, 133(01), 29–39.

Salman, A F M, Skibniewski, M J and Basha, I (2007) BOT Viability Model for Large-Scale Infrastructure Projects. Journal of Construction Engineering and Management, 133(01), 50–63.

Subprasom, K and Chen, A (2007) Effects of Regulation on Highway Pricing and Capacity Choice of a Build-Operate-Transfer Scheme. Journal of Construction Engineering and Management, 133(01), 64–71.